Best From China 

                   
  BEST FROM CHINA REPRESENTS THE BEST ENGINEERING AND CONSTRUCTION TEAMS FROM CHINA.
Exhibition Pavilion Construction & Fitting Out

Coca Cola pavilion at Beijing 2008 Olympic

Time: 2007 to 2008
Scope of Work:

  • Temporary pavilion construction from scratch, including concept and engineering design, foundation, piling, steel structure, membrane system, 100% fitting-out, and 100% dismantling.

  • Audio & Video and lighting installation, programming, and operation

  • The highlight of this project was team-work and it was done by all the world glass companies: Beijing Shoujian Construction, RM Production, Creative Arts, LightSwitch, Audisee, and EWI
Coca Cola Pavilion at Beijing 2008 Olympic
Adidas Pavilion at Beijing 2008 Olympic

Adidas pavilion at Beijing 2008 Olympic

Time: 2007 to 2008
Scope of Work:

  • Temporary pavilion construction from scratch, including concept and engineering design, foundation, piling, steel structure, membrane system, 100% fitting-out, and 100% dismantling.

  • Audio & Video and lighting installation, programming, and operation

  • The highlight of this project was its 90-meter long LED belt.  It was a spiral shape, running from ground floor to the top of second floor.
Colombia State Pavilion at Shanghai 2010 World Expo

Time: 2010
Scope of Work:
  • The pavilion structure was rented from Expo, and we did the entire decoration and fitting out design, expansion / renovation construction for exterior balcony, tower with art glass facade and backlight, carved panels at the 3 sides of the building with backlight, VIP mezzanine, and an interior "bridge".

  • 6-meter wide GRC waterfall, artificial plantation and scenery, exhibition and retail counters.

  • 6-month long operation support and maintenance including electricity, air conditioning, AV system, and lighting.
Colombia Pavilion at Shanghai 2010 World Expo
Japan Pavilion at Shanghai 2010 World Expo

Japan Pavilion at Shanghai 2010 World Expo

Time: 2010
Scope of Work: Membrane System
  • The pavilion is a semi-circular structure and covered by a purple membrane material. Its facade is similar to China’s National Aquatics Center, or Water Cube, in Beijing. Several antennae and caves make the pavilion a "breathing organism," which will express the harmony between the human heart and technology.

  • The pavilion will use solar energy collection batteries hidden in the double-layer membrane, and the caves will collect rainwater to spray on its exterior surface to keep temperatures cool.

Saic Pavilion at Shanghai Auto Show 2011

Time: 2011
Scope of Work:
  • Temporary pavilion construction from scratch, including concept and engineering design, steel structure, membrane system, 100% fitting-out, and 100% dismantling.
  • Audio & Video and lighting installation, programming, and operation
  • The highlight of this project was the steel structure and membrane system was 100% test-installed in the factory.  It took only 3 day to erect steel structure and install the membrane system without any major issues.
 Shanghai Auto Industry Co. at Shanghai Auto 2011
World Longest LED Belt at Adidas Pavilion of Beijing 2008 Olympic

AV and Multimedia System Design, Installation, and Operation

Time: 2007 to today
Scope of Work:
  • It was the 90-meter long LED belt that made the Adidas pavilion for Beijing 2008 Olympic outstanding from all the pavilions.  It was a spiral shape, running from ground floor to the top of second floor. All images were synchronized across the LED section.

  • We are representing of a group of world-class exhibition companies, like RM Production, Creative Arts, LightSwitch, and Audisee from US, and LevelDisplay from China
 

AV and Multimedia System Design, Installation, and Operation

Time: 2007 to today
Scope of Work:
  • Daily updated video clips were major attraction in Coca Cola Pavilion for Beijing 2008 Olympics.

  • We are representing of a group of world-class exhibition companies, like RM Production, Creative Arts, LightSwitch, and Audisee from US, and LevelDisplay from China
A Multimedia Festival at Coca Cola Pavilion of Beijing 2008 Olympic
 

Last Update on March 30, 2013 

BFCC (BestFromChina.Com) is focusing on infrastructural works across Africa and Middle East.

Supported by CNEGC (China New Era Group Corperation), Hebei Foreign Investment and Economic Cooperation Association, and other Central State-run Enterprises (CSE) and State-run Enterprises (SE), BFCC serves as a platform to show the EPC and BOT capabilities of companies and corporations from China in the following field:

  • POWER (Power generation by coal, oil, hydro, thermal, wind, and solar PV; Power transmission and distribution; Cable and Electric Cabinet, etc.)
  • WATER (Water supply, drainage, sewage system; Water purification, water treatment, waste water treatment; dam, irrigation system, etc. ),
  • ROAD & BRIDGE (Construction of road, express way, highway, culvert, flyover, bridge; airport runway and parking apron, etc.)
  • STEEL STRUCTURE (High-rise building, airport terminal, hangar, stadium, theater; warehouse and factory workshop, etc.)
  • EQUIPMENT, MACHINARY, AND PIPELINE ERECTION (Refinery, petrochemical & pharmaceutical factory, cement plant, pipeline fabrication and installation, etc.)
We do GC (General Contracting); EPC (Engineering, Procurement, and Construction), Pre-financing, BOT (Build, Operate, and Transfer), and PPP (Public Private Partnership)
           
power generation, power transmission and distribution   WATER (Water supply, drainage, sewage system; Water purification ROAD & BRIDGE (Construction of road, express way, highway, culvert, flyover, bridge STEEL STRUCTURE (High-rise building, airport terminal EQUIPMENT, MACHINARY, AND PIPELINE
POWER (Power generation by coal, oil, hydro, thermal, wind, and solar PV; Power transmission and distribution; Cable and Electric Cabinet   WATER (Water supply, drainage, sewage system; Water purification, water treatment, waste water treatment; dam, irrigation system, etc. ) ROAD & BRIDGE (Construction of road, express way, highway, culvert, flyover, bridge; airport runway and parking apron, etc.) STEEL STRUCTURE (High-rise building, airport terminal, hangar, stadium, theater; warehouse and factory workshop, etc.) EQUIPMENT, MACHINARY, AND PIPELINE INSTALLATION (Refinery, petrochemical & pharmaceutical factory, cement plant, pipeline fabrication and installation, etc.
write your inquiry We welcome inquiries by project owners, designers, developers, builders, and contractors.  Please fill out the Inquiry Form and and we get back to you within 24 hours in the most cases.
download our catalogue To download our online catalogue, please fill up the Download Request Form to let us know what you are interested in, what is your project, where is your project, and how you want to handle your project.
 
© BFCC (BestFromChina.Com) 2000 - 2013, China, UAE, Saudi Arabia, Qatar, Ghana, Zambia, South Africa, US
China Head Office: Tel.: (+86) 186-0171-6594; EMAIL: headoffice@bestfromchina.com
Toronto Overseas Office: Tel. (+1) 416-900-2653;  EMAIL: overseasoffice@bestfromchina.com